The DGF series fire wall hangers come in three different models (DGF, DGBF, and DGHF) and provide a time-saving solution for multi-family, multi-level building construction. They are easily installed on a two-hour wood stud fire wall during framing and feature enough space for two layers of 5/8” gypsum board (drywall) to be put into place after the framing is complete.
DGF – A top-flange hanger that connects floor trusses and joists to wood stud walls. It features a v-shaped joist stop at the top.
DGBF – A top-flange hanger featuring an angle joist stop to prevent the beam from seating too far back in the stirrup.
DGHF – features a top-flange design which allows for hangers to be installed and fit together back to back.