SKU: SET3G22-N

Strong-Tie SET-3G22-N - 22 Oz. Epoxy Anchor w/ Nozzle, Pkg 1

Strong-Tie SET-3G22-N - 22 Oz. Epoxy Anchor w/ Nozzle, Pkg 1!

Skip to product information

Continue Browsing

Epoxy Anchoring Adhesive

$52.98
 
Request Bulk Pricing
Request Bulk Pricing
Ships FREE Dec 16 when you add 4 to your cart
Fill out the form below or give our sales consultants a call at 866-421-4854.

Specifications

Additional Info: Cartridge Size: 8.5 oz.
Manufacturer name: Simpson Strong-Tie
Quantity: 22 oz.
Type: Epoxy Anchor
Description

Simpson SET-3G is a high-strength epoxy adhesive that's been formulated for anchoring threaded rod and rebar doweling in cracked and uncracked concrete. The new SET-3G epoxy has a higher temperature range than previous SET epoxies for better performance and consistency. Comes with one mixing nozzle and works with a standard caulk gun.


NOTE: This item is NOT eligible for express shipping, and must ship via Ground only.


California Residents: WARNING

View full details

Continue Browsing

Epoxy Anchoring Adhesive

× WARNING: This product can expose you to chemicals which are known to the State of California to cause cancer, birth defects and other reproductive harm. For more information visit: www.P65Warnings.ca.gov.

Customer Reviews

Based on 1 review
100%
(1)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
H
Heil Deck
Horizontal rebar install

We built a concrete anti-lift ballast weight according engineered plans. We drilled 106 holes in an existing footing 4” deep. The plan called for #4 rebar epoxied into the each hole. We brushed and blew out each hole as per Simpson’s instructions. In the past we had used the SET 3G epoxy with manual dispenser & mixing nozzles on previous projects and these worked perfectly, as we have come to expect from Simpson products. I had not used the Adhesive Retaining Caps before and our third party inspector had not seen them before.

Our technique was to slide the cap five inches up each rebar piece then inject the epoxy in the hole 2/3 full. Then we twisted each rebar piece into the hole. As the epoxy was displaced and started to leak from the hole we slid the ARC along the rebar into the hole. This trapped the epoxy in the hole and positioned the rebar so it stayed perpendicular to the footing instead of sagging down. The result was the epoxy stayed in the hole instead of dribbling out and the rebar was in the correct position for tying the rest of the rebars. The inspector was impressed. The job looked tidy and professional. I plan to use the ARC’s in the future.